How to use this tool
Check the units, enter your values, and run the tool. Results follow the assumptions and method below.
Calculation method
Work duration
(mod(endValue-start+1440,1440)-breaks)/60Shift shorter than 24h; equal start/end means zero. Break cannot exceed shift.
Shift shorter than 24h; equal start/end means zero. Break cannot exceed shift.
Enter your values and run the tool to see your result.
Check the units, enter your values, and run the tool. Results follow the assumptions and method below.
(mod(endValue-start+1440,1440)-breaks)/60